FM200 and Novec 1230 nozzle layout, pipe routing and OEM coordination drawings prepared for sensitive equipment protection and authority approval.
We design gas suppression systems for server rooms, switch rooms and other critical spaces — producing nozzle layouts, pipe routing drawings and full OEM coordination.
Our process handles the interface between design drawings and OEM hydraulic calculations to produce a single, coherent approval submission.


Nozzle locations and pipe routing prepared based on enclosure geometry and protection requirements.
Layout drawings shared with OEM for hydraulic and agent discharge calculations.
Calculation outputs incorporated into drawings and prepared for authority submission.
Complete suppression design package from initial layout through to coordinated approval drawings.
Send us your room drawings and we'll confirm scope, OEM coordination and fee upfront.